CK Chong · IQI Realty Sdn Bhd · REN46305 · Site-visited, independently curated · Updated weekly
Bangsar · Last checked 05 Apr 2026

111 Menerung

BRDB Developments Sdn Bhd  ·  Bangsar  ·  Freehold
111 Menerung — Bangsar

Developed by BRDB Developments Sdn Bhd, 111 Menerung is a freehold residential project in Bangsar with a scheduled completion date of 31 March 2027. The development features 2 to 3+1 bedroom units measuring 1,001 to 3,714 square feet, with starting prices at RM 1,745,000.

I. Project details

The facts

Developer
BRDB Developments Sdn Bhd
Address
111, Jalan Menerung, Bangsar, 59000 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur
Neighbourhood
Bangsar
Price
RM 1,745,000 — RM 6,718,000
Tenure
Freehold
Bedrooms
2 - 3+1
Built-up
1001–3714 sqft
Completion
31 MAR 2027
Total units
111
Last updated
2026-04-05
💰 Financing

What's the monthly commitment?

Estimate the monthly instalment based on price, loan margin, tenure, and interest rate.

IV. Key highlights

Why this project

  • Freehold commercial-titled residence situated in the prime Bangsar enclave.
  • Exclusive low-density tower offering just 111 units across 23 floors.
  • Generous living spaces ranging from 1,001 sq ft to 3,714 sq ft with 2 to 3+1 bedrooms.
  • Premium side-by-side parking allocations providing 1 to 3 car bays per unit.
  • Efficient vertical transport with 4 lifts serving only 6 to 10 units per floor.
  • Highly competitive maintenance fee estimated at RM0.95 psf including sinking fund.
  • Comprehensive multi-tier security system guarantees maximum resident privacy and safety.
  • Attractive entry pricing from RM1,680 psf with gross prices starting at RM1,745,000.
  • Buyers can enjoy up to 6% total rebate by signing the SPA within 30 days.
VIII. FAQ

Buyer questions

Q.01What is the tenure of 111 Menerung?

The development is offered on a freehold basis, giving owners permanent land ownership. (Source: YouTube review)

Q.02When is the expected completion date?

The project is slated for completion on 31 March 2027. (Source: YouTube review)

Q.03How many units are in the development and what does that mean for density?

Only 11 units are being built on the 0.83‑acre site, making it an ultra‑low‑density project in Bangsar. (Source: YouTube review)

Q.04What are the price and size ranges for the units?

Units start at RM 1,745,000 and range from 1,001 sqft to 3,714 sqft, with layouts of 2‑bedroom, 3‑bedroom + 1 study, etc. (Source: YouTube review)

Q.05How close is the development to public transport?

The site is about 150 m from the MRT station (Pavilion Damansara Heights) and within a 5‑stop ride to Pusat Bandar Damansara and a 6‑stop ride to TRX. (Source: YouTube review)

Q.06What amenities are nearby for daily needs?

It is located right behind Bangsar Shopping Centre, within walking distance to grocery stores, eateries, and a monorail line that connects to the wider Klang Valley network. (Source: YouTube review)

Q.07What are the key design features of the units?

All units feature high ceilings, floor‑to‑ceiling windows (13.5 mm thick for soundproofing), generous living spaces, and a separate guest bathroom with its own door. (Source: YouTube review)

Q.08What kitchen and bathroom fittings are included?

Kitchens come with full‑size cabinets, built‑in oven, hob, hood, and compressed marble countertops that require less upkeep; bathrooms have marble flooring, marble tops, and premium shower screens. (Source: YouTube review)

Q.09Is there parking available?

The development provides eight levels of underground parking for residents. (Source: YouTube review)

Q.10What is the management fee?

Buyer concern to verify during viewing: some public owner/viewer comments mention the management fee is reported to be around RM 1 per square foot.

Q.11Can foreigners purchase a unit?

Buyer concern to verify during viewing: some public owner/viewer comments mention foreign buyers are allowed to purchase freehold condominiums in Malaysia, subject to the minimum purchase price set by the government (typically RM 1 million for non‑MM2H buyers).

Q.12Is the project ready for immediate move‑in?

No, the development is still under construction and will be completed in March 2027. (Source: YouTube comment; Source: YouTube review)

Q.13Are there any larger unit types still available?

Buyer concern to verify during viewing: some public owner/viewer comments mention the developer still has the 1,087 sqft unit type available for purchase; interested buyers should contact the sales team directly.

Q.14What is the expected return on investment for this condo?

Buyer concern to verify during viewing: some public owner/viewer comments mention some commenters believe the pricing may limit ROI, but the project’s ultra‑low density, prime Bangsar location, and freehold status are intended to support long‑term value appreciation.

Next step

Interested in 111 Menerung?

Get current availability, unit pricing, viewing slots, and loan pre-approval. CK replies personally, usually within the hour.

WhatsApp CK
Browse WhatsApp CK